BEGIN:VCALENDAR
VERSION:2.0
PRODID:Westport, CT Calendar Creator
METHOD:PUBLISH
BEGIN:VEVENT
DTSTAMP:20250627T144037
DTSTART:20250701T093000
DTEND:20250701T235900
SUMMARY:Conservation Commission Field Trip
DESCRIPTION:<p><strong>NOTICE OF FIELD TRIP&nbsp;<br>CONSERVATION COMMISSION</strong>&nbsp;<br><br>The Westport Conservation Commission will conduct a site visit on Tuesday, July 1, 2025 at 9:30 a.m. for orientation purposes only to the following properties in preparation for reviewing the following agenda items at its July 2, 2025 Special Meeting:&nbsp; &nbsp; &nbsp;<br>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<br>1. 24 Center Street – Sewer Pump Station #9:&nbsp; Application #IWW,WPL-12170-25 by Peter Ratkiewich, Director of Public Works on behalf of the Town of Westport to install bypass port on the existing force main. Installation of new sewage pumps and interior fittings. The project requires installation of new exterior control valves and temporary diversion pipework to facilitate repairs. Work is within the 20-foot non-disturbance buffer and WPL area of Muddy Brook.&nbsp;<br><br>Members will meet at the sites in their own vehicles. The sites might be especially wet and or be prone to ticks so appropriate clothing and footwear is recommended.&nbsp;<br><br>Posted with the Town Clerk’s Office on June 27, 2025</p><p>&nbsp;</p><p><a href="https://www.westportct.gov/home/showpublisheddocument/110822/638866317937200000" target="_blank">Notice of Field Trip</a><br><br>&nbsp; &nbsp;</p><div></div>
X-ALT-DESC;FMTTYPE=text/html:<p><strong>NOTICE OF FIELD TRIP&nbsp;<br>CONSERVATION COMMISSION</strong>&nbsp;<br><br>The Westport Conservation Commission will conduct a site visit on Tuesday, July 1, 2025 at 9:30 a.m. for orientation purposes only to the following properties in preparation for reviewing the following agenda items at its July 2, 2025 Special Meeting:&nbsp; &nbsp; &nbsp;<br>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;&nbsp;<br>1. 24 Center Street – Sewer Pump Station #9:&nbsp; Application #IWW,WPL-12170-25 by Peter Ratkiewich, Director of Public Works on behalf of the Town of Westport to install bypass port on the existing force main. Installation of new sewage pumps and interior fittings. The project requires installation of new exterior control valves and temporary diversion pipework to facilitate repairs. Work is within the 20-foot non-disturbance buffer and WPL area of Muddy Brook.&nbsp;<br><br>Members will meet at the sites in their own vehicles. The sites might be especially wet and or be prone to ticks so appropriate clothing and footwear is recommended.&nbsp;<br><br>Posted with the Town Clerk’s Office on June 27, 2025</p><p>&nbsp;</p><p><a href="https://www.westportct.gov/home/showpublisheddocument/110822/638866317937200000" target="_blank">Notice of Field Trip</a><br><br>&nbsp; &nbsp;</p><div></div>
LOCATION:
CLASS:PUBLIC
END:VEVENT
END:VCALENDAR
